Basic data | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Station number: | 1328
Station name: | Komari Vizka
| Station type: | stacionary - AMS
| District: | Teplice
| Institution: | ORGREZ, a.s. | Laboratory address |
ORGREZ-od.imisí 7430
| Ing. Kopřiva Emil, CSc. Budovatelů 2830 434 01 Most Tel: 7702785
| Fax: 28725
| Impeachable worker address
|
ORGREZ
| Ing.Kopřiva Emil,CSc. Budovatelů 2830 434 01 Most Tel: 7702785
| Fax: 28725
| Location
| Geographics coordinates: | latitude: 50°
42'
25" ;  
longitude: 13°
50'
40"
| Altitude: |
| Expletory data of station
| Landscape: | Upland platform in terrain of considerable declination (above 10%)
| Scenery: | Permanent herbaceous (grass) vegetation
| Representative: | Local (Regional) scale (ten to hundreds km)
| Purpose: | Evaluation of the significant sources effect on air pollution level
| Verbal description placing
| Na vrcholu Krušných hor - nad stanicí ČHMÚ - KRUPKA.
| Registration
| Date of establishment station: 01-01-1995
| Date of termination station:
| Pollutant
Method
Unit
Interval
Begin date
End date
SO2 (sulphur dioxide)
| UVFL (UV-fluorescence) | ug/m^3
| 30 min | 01-01-1995 |
| WV (wind velocity)
| OPEL (optoelectronic method) | m/s
| 30 min | 01-01-1995 |
| WD (wind direction)
| OPEL (optoelectronic method) | deg
| 30 min | 01-01-1995 |
| T10m (temperature 10m above terrain)
| PT100 (resistance method) | K
| 30 min | 01-01-1995 |
| |