logo ČHMÚ

KPRBA, Prebuz

Index Back

Situation in the year: 2004


Basic data
Code of the measuring programme in the given locality: KPRBA
Old ISKO number: 1033
Locality: Prebuz
Type of measuring programme: Automated measuring program
Measuring networks: Black triangle 
Address
Administrator ČHMÚ-pobočka Ústí n/Labem
Pošt. přihrádka 2
Ing.Bitter     
40011  Ústí n/Labem
Tel:472706053
Fax:472706024
E-mail: bitter@chmi.cz
Data supplier ČHMÚ-pobočka Ústí n/Labem-AIM
Pošt. přihrádka 2
Ing.Bitter Miroslav     
40011  Ústí n/Labem
Tel: 472706053
Fax: 472706024
E-mail: bitter@chmi.cz
Supplementary data
Target of the measurement programme: Usage for operational management and regulation (SRVS)
Place description
Otevřená poloha na náhorní rovině na okraji louky na SV okraji osady, nejbližší domky cca 80m.
Measurement
Lab. = Laboratory, A = authorization, R = data available in the real time regime, Par. = parallel measurement
Lab. Component Method Unit A R Par. Interval Date of start Date of end
1 GLRD [global radiation] TDM [temperature difference method] W/m2 Yes No 0 1h 01.01.2004  
1 GLRD [global radiation] TDM [temperature difference method] W/m2 Yes No 0 10min 01.01.2004  
1 GLRD [global radiation] TDM [temperature difference method] W/m2 Yes Yes 0 30min 01.09.2003 31.12.2003 
1 h [relative air humidity (h. of air)] CAP [capacitance sensor] % Yes No 0 1h 01.01.2004  
1 h [relative air humidity (h. of air)] CAP [capacitance sensor] % Yes Yes 0 30min 01.09.2003 31.12.2003 
1 NO [nitrogen monoxide] CHLM [chemiluminescence] µg/m3 Yes No 0 1h 01.01.2004  
1 NO [nitrogen monoxide] CHLM [chemiluminescence] µg/m3 Yes Yes 0 30min 04.04.1993 31.12.2003 
1 NOx [nitrogen oxides(oxides of nitrogen)] CHLM [chemiluminescence] µg/m3 Yes No 0 1h 01.01.2004  
1 NOx [nitrogen oxides(oxides of nitrogen)] CHLM [chemiluminescence] µg/m3 Yes Yes 0 30min 04.04.1993 31.12.2003 
1 NO2 [nitrogen dioxide] CHLM [chemiluminescence] µg/m3 Yes No 0 1h 01.01.2004  
1 NO2 [nitrogen dioxide] CHLM [chemiluminescence] µg/m3 Yes Yes 0 30min 04.04.1993 31.12.2003 
1 O3 [ozone] UVABS [UV-absorption] µg/m3 Yes No 0 1h 01.01.2004  
1 O3 [ozone] UVABS [UV-absorption] µg/m3 Yes Yes 0 30min 20.04.1994 31.12.2003 
1 p [atmospheric pressure] APRESS [atmospheric pressure measurement] hPa Yes No 0 1h 01.01.2004  
1 p [atmospheric pressure] APRESS [atmospheric pressure measurement] hPa Yes Yes 0 30min 01.09.2003 31.12.2003 
1 PM10 [suspended particles (PM10 fraction)] RADIO [radiometry - beta ray absorption] µg/m3 Yes No 0 1h 01.01.2004  
1 PM10 [suspended particles (PM10 fraction)] RADIO [radiometry - beta ray absorption] µg/m3 Yes Yes 0 30min 21.10.1995 31.12.2003 
1 RAD_A [RAD_A] RAD [dosimeter] uSv/hod Yes No 0 10min 01.01.2004  
1 RAD_A [RAD_A] RAD [dosimeter] uSv/hod Yes No 0 1h 01.01.2004  
1 RAD_B [RAD_B] RAD [dosimeter] uSv/hod Yes No 0 1h 01.01.2004  
1 RAD_B [RAD_B] RAD [dosimeter] uSv/hod Yes No 0 10min 01.01.2004  
1 RAD_C [RAD_C] RAD [dosimeter] uSV/hod Yes No 0 1h 01.01.2004  
1 RAD_C [RAD_C] RAD [dosimeter] uSV/hod Yes No 0 10min 01.01.2004  
1 SO2 [sulphur dioxide] UVFL [UV-fluorescence] µg/m3 Yes No 0 1h 01.01.2004  
1 SO2 [sulphur dioxide] UVFL [UV-fluorescence] µg/m3 Yes Yes 0 30min 04.04.1993 31.12.2003 
1 SO2 [sulphur dioxide] UVFL [UV-fluorescence] µg/m3 Yes No 0 10min 01.01.2004  
1 SPM [suspended particulate matter] RADIO [radiometry - beta ray absorption] µg/m3 Yes Yes 0 30min 04.04.1993 20.10.1995 
1 T2m [temperature 2m above terrain] PT100 [resistance method] K Yes No 0 1h 01.01.2004  
1 T2m [temperature 2m above terrain] PT100 [resistance method] K Yes Yes 0 30min 01.09.2003 31.12.2003 
1 WD [wind direction] OPEL [optoelectronic method] deg Yes No 0 1h 01.01.2004  
1 WD [wind direction] OPEL [optoelectronic method] deg Yes Yes 0 30min 01.09.2003 31.12.2003 
1 WD [wind direction] OPEL [optoelectronic method] deg Yes No 0 10min 01.01.2004  
1 WDm [30 min wind direction maximum] OPEL [optoelectronic method] deg Yes No 0 10min 01.01.2004  
1 WDm [30 min wind direction maximum] OPEL [optoelectronic method] deg Yes No 0 1h 01.01.2004  
1 WV [wind velocity] OPEL [optoelectronic method] m/s Yes No 0 1h 01.01.2004  
1 WV [wind velocity] OPEL [optoelectronic method] m/s Yes Yes 0 30min 01.09.2003 31.12.2003 
1 WV [wind velocity] OPEL [optoelectronic method] m/s Yes No 0 10min 01.01.2004  
1 WVm [30min wind velocity maximum] OPEL [optoelectronic method] m/s Yes No 0 1h 01.01.2004  
1 WVm [30min wind velocity maximum] OPEL [optoelectronic method] m/s Yes No 0 10min 01.01.2004  

 

List of laboratories
Laboratory number 1
pošt. přihrádka 2
Ing. Miroslav  Bitter   
400 11  Ústí nad Labem
Tel: 472 706 053
Fax: 472 706 024
E-mail: bitter@chmi.cz

Index Back
Valid XHTML 1.0!